(jointly with Renewable Energy Agency (REA))
Objective: to perform an assessment of the Landfill site and amount of LFG available and the options for the LFG utilization at Rivne MSW Landfill.
Project description:
Evaluation of the LFG quality and availability at the Rivne landfill through a pump test based on three-wells limited collection system and open flare; evaluation of the technical and economical options for the implementing of full-scale LFG recovery system; evaluation of the available LFG utilization options, including flaring, electricity generation and direct LFG use.
Project activities:
- Pump test proposal, design and implementation, measurement results analysis;
- Development of Landfill Gas model, feasibility study;
- LFG Collection System Design;
- Flare installation
Place of implementation: Rivne MSW Landfill, Ukraine
Project financing: Environmental Protection Agency, United States of America (US EPA); Methane to Markets Partnership (M2M))
Main project parameters
Number of wells: | 3 wells and 6 probes |
Average LFG flow rate: | 27.8 m3/h |
Average CH4 content in LFG: | 38.8 % |
Expected GHG emission reductions: | 2.5-2.6 th. t СО2-eq |
Total project cost:
- $3 522 377 — flaring option
- $4 463 306 — CHP option
Utilization of LFG:
- Flaring
- Combined heat and power generation