Installation of 350 kW straw-fired boiler in Stavy village
Place of implementation: Educational institution of the Stavy village, Kagarlyk region, Kyiv oblast, Ukaine
Financing Agency, Partners: IPP/ CRDF program; Pacific Northwest National Laboratory (PNNL), USA; U.S. Department of Energy (DOE); CSA Energy (industrial partner), USA
Main project parameters
Developer of boiler: | SEC “Biomass” |
Manufacturer of boiler: | OJSC AK “SATER”, Ustynivka branch of “Sakhenergoservis”, Ukraine |
Thermal capacity: | 350 kW |
Efficiency: | 83% |
Fuel: | big round straw bales (l=1.5 m; ?1.8 m) |
Amount of straw per load: | 200-250 kg (1 big bale) |
Combustion period per load: | about 3 hours |
Consumption of straw: | 380 t per heating season |
Substitution of natural gas: | 171 th. m3 per heating season |
Payback period: | 2-3 years |