«Landfill methane capture and utilisation at Khmelnitsky landfill, Ukraine»
Execution period: 2008
Project summary: Construction of landfill gas collection and utilization system at the landfill of Khmelnitsky city, resulting in reduction of GHG emissions through methane destruction and possible energy recovery.
Project applicant/partner: E.ON/Bj?rsen Consulting Engineers, Germany
Expected GHG emission reductions: Total GHG emission reductions for the period 2009-2011 is 175 000 t CO2-eq. (flaring option) and 205 000 t CO2-eq. (energy generation option)
«Landfill methane capture and utilisation at Krementchug landfill, Ukraine»
Execution period: 2005
Project summary: Construction of landfill gas collection and utilisation system at the landfill of Krementchug, resulting in reduction of GHG emissions through methane utilization and possible energy displacement.
Project applicant: Austrian energy agency (EVA)
ОExpected GHG emission reductions: Total GHG emission reductions for the period 2009-2012 is 137 000 t CO2-eq.
«Landfill methane capture and utilisation at Luhansk landfill, Ukraine»
Execution period: 2007
Project summary: Construction of landfill gas collection and utilisation system at the landfill of Luhansk city, resulting in reduction of GHG emissions through methane utilization and possible energy displacement.
Project applicant: Amest Sp. Z o. o.
Expected GHG emission reductions: Total GHG emission reductions for the period 2009-2012 is 200 000 t CO2-eq. (flaring option) and 265 000 t CO2-eq. (energy generation option).